Atlas / Pellizzari Electric teamed up with Coulter Construction to build a combined total of 3.6MW photvoltaic ‘shade structure’ systems located at 8 active school campuses. The project spanned over 18 months, which required extensive coordination and scheduling to minimize school disruptions associated with parking lot activity and switchgear tie-in work. Our work included AC interconnect, AC / DC wiring, lighting, grounding, underground trenching and patching, and system startup at all 8 sites. The project included a TIGO Energy Maximizer System, maximizing the solar panel efficiency and providing great payback for the District.