Proterra Headquarters Proterra | Burlingame, CA

Project Summary

Proterra Headquarters

Build out new R&D space for growing zero emissions electric bus company

Owner: Proterra
Location: Burlingame, CA
Design Team: Aurum Engineering
Contract Value: $1,400,000
Completion Date: May 2017
Duration: 12 Months
Related Information
Core Market
Services
Project "In Progress"

Atlas / Pellizzari Electric was hired by Proterra to design and build out a R&D facility for them located in Burlingame.  Proterra is a leader in the design and manufacturing of zero-emission electric buses that reduce fleet operating costs and eliminate dependency on fossil-fuels.  The project included a complete build-out of a 27,000 square foot facility.  The work included a new 4,000 amp, 480V switchboard with new PG&E service and bus duct. This amount of power was needed to handle the operating loads of the battery production and testing equipment.  This project included huge feeder conduits, racks, and lots of planning to bring power to the new equipment quickly and efficiently.  It was an exciting project that required us to remain available for the various electrical adders and changes that were required well after the initial build out.

Photo Gallery  (8)

Information Request

Fill out the form below to let us know more about your project requirements. All fields are required unless otherwise specified.

* = Required Field

  • Drop files here or
    Max. file size: 10 MB, Max. files: 3.
    • This field is for validation purposes and should be left unchanged.