MENU

Taylor Middle School New Cafeteria Building Millbrae School District | Millbrae, CA

Project Summary

Taylor Middle School New Cafeteria Building

Ground up 16,000 square foot Cafeteria with associated site improvements

Owner: Millbrae School District
Location: Millbrae, CA
Design Team: IBI Architecture & Planning
Contract Value: $859,000
Completion Date: February 2014
Duration: 12 Months
General Contractor: Blach Construction
Related Information
Core Market
Services

Atlas / Pellizzari Electric teamed up with Blach Construction to build a new cafeteria building, consisting of electrical systems, low voltage systems, life safety, and site improvements, for the approximately 16,000 square foot cafeteria. The project included a state of the art kitchen and many unique features which made it a challenging but desirable project.

Photo Gallery  (4)

Information Request

Fill out the form below to let us know more about your project requirements. All fields are required unless otherwise specified.

* = Required Field

  • Drop files here or
    Max. file size: 10 MB, Max. files: 3.
    • This field is for validation purposes and should be left unchanged.